Development of production facilities at the quay port workshops (auxiliary berths №№ 1В, 29В) in the seaport of Reni

Project
description

Organising port workshops in the mooring line zone with total length of 165 m, arranging the processing and assembling procedures using port workshop facilities

List of works
to perform

Arrangement of the collection and handling processing sector

Current condition
of the facility

The repair area is purposed for current repairs carrying out

Primary technical characteristics

Specialised production and repair complex with machine-tools equipment installed
Open sites’ total area: 0.67 ha
Main building: 4-floors structure (48 m x 98 m)
Port embankment with a portal crane where it is possible to arrange ships repair.
The port workshops include:
– shipyard shop
– electrical facilities shop
– welding shop
– auxiliary procedures shop (smithy, fitting shop, etc.)
Exit to shallow aquatorium

Berths specification

BerthLengthDepthCargo type
№ 1В80,0 m3,5 mauxiliary
№ 29В165,0 m3,6 mauxiliary

Project implementation beneficiaries

Private
investor

Possibility of long-term management of public assets
Ability to reconstruct existing capacities for the organisation of processing / harvesting sector
Benefit from an effective use of existing assets and related infrastructure

State
Enterprise
“Ukrainian
Sea Ports
Authority”

Ability to reconstruct existing capacities for the organisation of processing / harvesting

State

Increase in revenues coming to budget of different levels (tax payment, concession payments)
Efficient public property management
Sea economy complex development

Other characteristics

Project implementation
cost and other
financial indicators

Determined by design documentation

Project implementation
deadline

2018-2023

Implementation form

Public private partnership, lease or other

Project implementation
interested parties

Ministry of Infrastructure, State Enterprise “Ukrainian Sea Ports Authority”, State Enterprise “Reni Commercial Sea Port”

Placement mapping