Construction of a specialised reloading complex for bulk cargoes and reconstruction of the complex of berths №№5 – 8 in ‘Pivdennyi’ seaport
Project
description
Construction of a specialised transhipment complex for bulk cargoes is a complex project, which can be divided into two parts:
– construction of coastal and berthing infrastructure will be carried out at the expense of the investor in the framework of public-private partnership
– the reconstruction of hydrotechnical structures (berths №№ 5, 6, 7, 8) will be carried out at the expense of the State Enterprise “Ukrainian Sea Ports Authority” or borrowed funds
The project objective is to increase the volume and speed of re-loading of export bulk cargoes entering the port by railway and which are being loaded onto sea vessels (berths №№ 5, 6), as well as imported bulk cargoes, arriving at the port by sea and shipped onto the railway transport (berths №№ 7, 8)
List of works
to perform
Reconstruction of the transhipment complex existing capacities
Current condition
of the facility
Project capacity of the railway station – 12 pairs of trains
Maximum volume of cargo processing (2015) – 15.046 million tons/year
Current condition of the facility
Primary technical characteristics
Specialised multipurpose transhipment complex
Warehouse capacity:
– Warehouse №1 (back area №№ 5, 6) –2,400.0 thousand tons
– Warehouse №2 (berths №№ 5, 6) – 920.0 thousand tons
– Warehouse №3 (berths №№ 7, 8) – 180.0 thousand tons
Berths specification
| Berth | Length | Designed depth | Main specialisation |
|---|---|---|---|
| №5 | 385 m | 21.0 m | export: iron ore pellets, IOC, coal |
| №6 | 370 m | 21.0 m | export: iron ore pellets, IOC, coal |
| №7 | 345 m | 19,0 m | import: coal |
| №8 | 250 m | 17.0 m | import: coal |
Project implementation beneficiaries
Private
investor
Possibility of long-term management of public assets
Possibility to increase transhipment capacities to 34 million tons per year (export – 24.0 million tons/year, import – 10.0 million tons/year)
Possibility to receive and handle ships with a carrying capacity of up to 250 thousand tons to full draft at the berth wall.
Benefit from an effective use of existing assets and related infrastructure
State
Enterprise
“Ukrainian
Sea Ports
Authority”
Increased revenues from port duties and other services due to the increase in the number of ship calls to the port
Berth infrastructure development
State
Enterprise
‘Commercial
Sea Port
‘Pivdennyi’
Operational activity optimisation
State
Increase in revenues coming to budget of different levels (taxes payment, compulsory payments)
Efficient public property management
Sea economy complex development
Other characteristics
Project implementation
cost and other
financial indicators
Determined with design documentation
Project implementation
deadline
Determined with design documentation
Implementation form
Public private partnership
Project implementation
interested parties
Ministry of Infrastructure, State Enterprise “Ukrainian Sea Ports Authority”, State Enterprise ‘Commercial Sea Port ‘Pivdennyi’